SMRT Projects and Energy Solutions Limited contracted INTEGEMS to undertake an ESIA Study for its proposed 6MWp PV Grid Connected Power Plant. The purpose of the ESIA is to provide environmental and social assessments by identifying the potentially significant environmental and socio-economic issues relating to the implementation, operation and decommissioning of the proposed Solar Plant development.

INTEGEMS was contracted by GeoPartners Limited to undertake an Environmental Social and Health Impact Assessment (ESHIA) Studies for a proposed 2D seismic exploratory survey offshore Sierra Leone. The seismic survey is required to obtain information about the underlying geological strata and the potential hydrocarbon deposits that lie with-in the formations beneath the seabed within the survey area.

INTEGEMS was contracted by Majestic Gold Mining Limited to undertake an ESIA for the development of its Project: The main objective of the ESIA project was to provide information on the nature and extent of potential environmental and social impacts arising from the construction and operation of the proposed projects and related activities.

Subcategories

Page 2 of 2